
Sliedrecht
Q2 2025
BM van Houwelingen
Crawl spaces, ground sealing, and floor insulation.
For 73 homes in the De Horst neighborhood in Sliedrecht, Schotgroep was engaged by contractor BM van Houwelingen.
The work is part of a large-scale sustainability initiative, in which the homes are being prepared for connection to the municipality's future district heating network. The end user of this project is housing corporation Tablis Wonen.
At the start of the project, it became apparent that many crawl spaces were poorly accessible or suffered from moisture and contamination. In order to enable the necessary technical modifications – including the installation of protective conduits – the base under the floor first had to be put in order.
Work performed:
To make the crawl spaces workable, safe, and future-proof, Schotgroep carried out the following activities:

Rationale behind the project
By thoroughly addressing the crawl space before the installation of the district heating network, we prevent future problems and ensure that the homes meet the requirements of a modern and sustainable energy system. This approach also provides an immediate structural solution for existing moisture problems.
Timeline:
The work will be carried out in phases over a period of more than a year, in coordination with the schedule of other renovation activities.
Want to know more about our approach to renovation or sustainability projects?
Feel free to contact us. We are happy to think along with you in the preparation or execution of large-scale projects.
Schotgroep specializes in insulating floors, crawl spaces, cavity walls, and roofs. We provide comprehensive solutions for your home and can combine multiple measures for optimal results.
Take a step towards a more energy-efficient and comfortable home today. Call us at 078 - 677 70 29; we are happy to think along with you.